Tuesday, November 15, 2016

The first cut.

Today I unloaded the truck cabin from my trailer and set it on my bridge.
 So the next thing I did was checking out the damage. At work a college of me did already do some work. Some panels were already cut out.
 Some are rusted away.

 Others seem to be drilled to remove a dent?

 Others are almost rusted completely trough.
 My coworker did cut some parts out on the drivers side.  He also cut loose the A-post and it was already showing some sagging. So I Welded in some braces.
 Then I removed 3 more parts at the A-post so I have room to work.
And then I cut a piece already prepared by my coworker drilled some holes and tacked it in place.
So the first piece of the repair is in.

No comments:

Post a Comment